Parksville RoofingFree Quote

Roof systems

Asphalt shingle roofing

Tear-off to the deck, venting calculated against the ceiling area below, and the eave, valley and flashing details named in writing before anything is ordered.

Parksville Roofing replaces asphalt shingle roofs down to the sheathing in Parksville, Qualicum Beach, and across Vancouver Island. We do this work most weeks of the year because asphalt shingles are the most common roof on Island houses. Shingles need a slope of at least 1 in 3 for a standard install, or 1 in 6 if we detail it as a low-slope job.

A shingle roof is a system. The underlay, the eave and valley protection, the flashings, the drip edge and the venting are what decide whether it reaches its rated life.

What the code actually requires here

Table 9.26.3.1 of the BC Building Code sets the minimum slope for asphalt shingles at 1 in 3 for normal application and 1 in 6 for the low-slope method. Below 1 in 6 the covering has to change: modified bituminous membrane is permitted from 1 in 50 up to a maximum of 1 in 4.

Article 9.26.5.1 requires it to run from the edge of the roof at least 900 mm up the slope, reaching a line not less than 300 mm inside the inner face of the exterior wall. The same article then lists what is exempt — including roofs of asphalt shingles installed in accordance with Subsection 9.26.8, and regions with 3,500 or fewer degree-days. Appendix C lists both Parksville and Qualicum Beach at 3,200 degree-days.

That is the legal minimum, and we go past it. A self-adhered membrane at the eaves and through the valleys costs little against the price of the roof, and on an exposed lot it is the cheapest protection against wind-driven rain there is.

Venting, and why it decides the roof's life

BC Building Code 9.19.1.2 sets unobstructed vent area at not less than 1/300 of the insulated ceiling area, rising to 1/150 where the slope is under 1 in 6 or the roof is framed with roof joists. Distribution counts as much as the total: vents on opposite sides of the building, with at least 25 per cent of the area at the top of the space and 25 per cent at the bottom.

If you add a ridge vent while insulation blocks your soffits, the new high vent has no low intake to draw air from. A shingle roof over a poorly vented attic runs hot in summer and damp in winter.

We calculate vent area against your insulated ceiling on every quote, and we tell you about blocked soffits even if fixing them is out of scope.

Tear-off, and what it finds

On a re-roof we always strip back to the sheathing so we can see the deck. Laying new shingles over an existing layer hides the deck, adds dead load, and turns every flashing into a patch.

With the old material off, the things that actually cause leaks become visible: split sheathing at a valley, step flashing rusted through at a wall junction, a plumbing stack boot that perished years ago, chimney counterflashing sitting on the mortar face rather than let into it. We photograph, price, and report anything we find before we cover it up.

Underlay and the details that leak

Article 9.26.6.1 lists asphalt-saturated sheathing paper or No. 15 felt as acceptable underlay, and 9.26.6.2 sets head and end laps at not less than 50 mm, overlapping eave protection by at least 100 mm. We use synthetic underlay and install it to the manufacturer's written instructions.

The leak almost never starts in the field of the roof. It starts at a penetration, a valley, a wall junction, a skylight curb or a change of plane. Those are the lines a quote should name one by one.

What a shingle re-roof includes

  • Full tear-off and shingle replacement

    Old covering and fasteners stripped to the sheathing so the deck can be seen and assessed.

  • Underlay and eave protection

    Underlay to 9.26.6.1, with self-adhered membrane at eaves and valleys where the exposure justifies it.

  • Ridge and intake ventilation

    Vent area calculated against the insulated ceiling area and split between high and low openings.

  • Valley and step flashing

    Open or closed valleys detailed to the roof geometry, and step flashing renewed at every wall junction.

  • Drip edge and gutter apron

    Metal edge at eaves and rakes so water leaves the roof rather than tracking back under it.

  • Plumbing stack and vent boot replacement

    Perished boots and collars replaced during the re-roof.

  • Sheathing and deck repair

    Split, rotted or delaminated sheathing replaced span by span, photographed and priced before it is covered.

  • Removal and disposal of old material

    Everything hauled off site, gutters cleared and the property magnet-swept for fasteners.

From assessment to cleanup

  1. Measure and assess

    We measure the roof area, slope, and edge lengths on the roof, then check your attic for intake, insulation depth, and daylight at the eaves.

  2. Strip to the deck

    We remove the old covering and fasteners, inspect your sheathing span by span, and photograph and report any defects before we cover them.

  3. Build the assembly

    Underlay, eave and valley protection, drip edge, step and counterflashing, then the shingle field.

  4. Vent, seal and clear

    We bring ridge and intake venting to the calculated area, detail all penetrations, magnet-sweep your yard, and haul away old material.

Local conditions

The north slope is where shingle roofs on this coast age fastest. Second-growth fir and cedar hold moisture against the surface for most of the winter, and moss lifts the tab edges. On a lot with heavy canopy the two slopes of the same roof can be in genuinely different condition, and it is worth pricing them as two decisions rather than one.

In practice

Situation
An older rancher on an acreage lot, the original asphalt shingles still shedding water on the south slope, the north slope carpeted in moss under second-growth fir.
Complication
The soffit vents are packed solid with blown-in insulation, so a ridge vent added later has no low intake to draw from.
Resolution
We fit baffles at every rafter bay before laying the new roof to bring unobstructed vent area back to the code's 1/300 ratio, split between top and bottom. The shingle specification stays identical on both slopes.

People also ask

Can new shingles go over the old ones?

We tear off down to the sheathing so we can inspect your deck.

Is eave protection required on a shingle roof in Parksville?

It is still worth installing at the eaves and valleys, but it is a choice rather than a requirement.

How long does a shingle roof last on this coast?

Manufacturers publish limited warranties running decades, but the service life a roof reaches here is set by ventilation, moss load on the north slope, and whether the flashings were detailed or patched. Two identical roofs on the same street can be a decade apart on those three things alone.

Does a re-roof need a building permit?

The Regional District of Nanaimo lists roofing repairs or replacements as work that does not require a building permit, provided no structural changes are made. A changed roof line, altered rafters or new framing puts the job back on the permit list, and properties inside a municipality fall under that municipality's own building bylaw.

Roofing in nearby communities

Let us take a proper look at your roof

Our on-site assessments are free, anywhere across Oceanside and the Regional District of Nanaimo.